Day 2 on the Poly Tunnel
08 April 2010 22:29:34

Hoops in place
Another day was spent by Johnny and James working on the polytunnel, the base has been stoned and the hoops are now in place so it is taking shape. There is a possibility that these hoops will be replaced with a slightly heavier one that we have on a reel. Saturday will hopefully see the timber frame for the doors and supporting the hoops be constructed by Ali and Johnny and if I can source the cover it'll be finished looking forward to having my little tunnel 9' X 18'.